RFT News: Kiewit - LADWP Haynes LMS100 Simple Cycle

RFT was declared on the LADWP Haynes Units 11 & 12 LMS100 simple cycle project. WSC developed the 3KEYMASTER process models for two of the six reference simple cycle plants. The 100 MWe units are based on GEs LMS100 Combustion Turbine Generator (CTG). The simulation included models for the CTGs, natural gas fuel systems, electrical systems, auxiliary systems and integration of two virtual distributed control systems; GE Mark Vie for the CTGs and Emerson Ovation for the BOP.